Turner Traffic
Turner Traffic
  • Home
  • Our Services
  • Contact Us

Traffic Engineering Consultants

Traffic Engineering ConsultantsTraffic Engineering ConsultantsTraffic Engineering Consultants
0449 730 401
admin@turnertraffic.com.au

About Us

Traffic and Transport Engineering

 Turner Traffic was formed in 2023 to provide high quality traffic engineering advice to clients working in the built environment, across both the public and private sectors.  We provide transport planning and traffic modelling services, applying risk management and common sense in traffic engineering to achieve practical solutions. We comfortably liaise with authorities, architects, planners, project managers and contractors. 

Experience

· Site master planning / feasibility studies 

· Transport impact assessments for DAs and Planning Proposals 

· Parking strategies 

· Active transport studies 

· Public transport studies 

· Car park / loading dock design 

· Sustainable transport studies 

· Peer reviews 

· Traffic intersection modelling

· Swept path analysis

· Construction traffic assessment

· Road safety auditing 

James Turner, Traffic Engineer

James Turner

BE (Hons) CPEng NER | Level 3 RSA

 

  

James Turner is responsible for all services that Turner Traffic offers.  For over 14 years, James has been involved in over 600 projects in his time at Arup. He acts as a trusted advisor, offering technical leadership on projects and is sought for his technical ability.

 


Learn More

Key projects

Ashmore Estate

476-478 George Street

Northpoint Tower

 Traffic impact assessments for master plan and site-specific DAs and construction traffic management plan and hoarding site checks in Erskineville 

Northpoint Tower

476-478 George Street

Northpoint Tower

We assisted with Tender and Construction documentation which included liaison with authorities to establish a suitable site construction management plan 

476-478 George Street

476-478 George Street

476-478 George Street

 Construction traffic management plan specifically for the implementation of a works zone on George Street utilising the footpath to keep the kerbside bus lane clear. 

Copyright © 2025 Turner Traffic - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept